Skip to content

A gradual release of Avioverse begins in October 2026. Request early access →

Appendix IV to AMC M.A.604 Maintenance organisation manual

Annex I (Part-M) · Regulation (EU) No 1321/2014 · EAR revision 2 Sep 2025

AppendixAppendix

Appendix IV to AMC M.A.604Maintenance organisation manual

1.Purpose

The maintenance organisation manual is the reference for all the work carried out by the approved maintenance organisation. It should contain all the means established by the organisation to ensure compliance with Part-M or Part-ML according to the extent of approval and the privileges granted to the organisation.

The maintenance organisation manual should define precisely the work that the approved maintenance organisation is authorised to carry out and the subcontracted work. It should detail the resources used by the organisation, its structure and its procedures.

2.Content

A typical Maintenance Organisation Manual for a small organisation (less than 10 maintenance staff) should be designed to be used directly on a day to day basis. The working documents and lists should be directly included into the manual. It should contain the following:

Part A — General

Table of contents

List of effective pages

Record of amendments

Amendment procedure

Drafting

Amendments requiring direct approval by the competent authority

Approval

Distribution

Name or title of each person holding a copy of the manual

Accountable manager statement

Approval of the manual

Statement that the maintenance organisation manual and any incorporated document identified therein reflect the organisation’s means of compliance with Part-M and Part-ML Commitment to work according to the manual

Commitment to amend the manual when necessary

Part B — Description

Organisation’s scope of work

Description of the work carried out by the organisation (type of product, type of work) and subcontracted work Identification of the level of work which can be performed at each facility.

General presentation of the organisation

Legal name and social status

Name and title of management personnel

Accountable manager

Senior managers

Duties and responsibilities

Organisation chart

Certifying staff and airworthiness review staff

Minimum qualification and experience

List of authorised certifying staff and airworthiness review staff, their scope of qualification and the personal authorisation reference Personnel

Technical personnel (number, qualifications and experience)

Administrative personnel (number)

General description of the facility

Geographical location (map)

Plan of hangars

Specialised workshops

Office accommodation

Stores

Availability of all leased facilities.

Tools, equipment and material

List of tools, equipment and material used (including access to tools used on occasional basis) Test apparatus

Calibration frequencies

Maintenance data

List of maintenance data used in accordance with M.A.402 or ML.A.402, and appropriate amendment subscription information (including access to data used on occasional basis).

Part C — General Procedures

Organisational review

Purpose (to insure that the approved maintenance organisation continues to meet the requirements of Part-M and Part-ML) Responsibility

Organisation, frequency, scope and content (including processing of authority’s findings) Planning and performance of the review

Organisational review checklist and forms

Processing and correction of review findings

Reporting

Review of subcontracted work

Training

Description of the methods used to ensure compliance with the personnel qualification and training requirements (certifying staff training, specialised training) Description of the personnel records to be retained

Subcontracting of specialised services

Selection criteria and control

Nature of subcontracted work

List of subcontractors

Nature of arrangements

Assignment of responsibilities for the certification of the work performed

One time authorisations

Maintenance checks

Certifying staff

Part D — Working Procedures

Work order acceptance

Preparation and issue of the work package

Control of the work order

Preparation of the planned work

Work package content (copy of forms, work cards, procedure for their use, distribution) Responsibilities and signatures needed for the authorisation of the work

Logistics

Persons/functions involved

Criteria for choosing suppliers

Procedures used for incoming inspection and storage of parts, tools and materials Copy of forms and procedure for their use and distribution

Execution

Persons/functions involved and respective role

Documentation (work package and work cards)

Copy of forms and procedure for their use and distribution

Use of work cards or manufacturer’s documentation

Procedures for accepting components from stores including eligibility check

Procedures for returning unserviceable components to stores

Release to Service – Certifying staff

Authorised certifying staff functions and responsibilities

Release to Service – Supervision

Detailed description of the system used to ensure that all maintenance tasks, applicable to the work requested of the approved maintenance organisation, have been completed as required.

Supervision content

Copy of forms and procedure for their use and distribution

Control of the work package

Release to Service – Certificate of release to service

Procedure for signing the CRS (including preliminary actions)

Certificate of release to service wording and standardised form

Completion of the aircraft continuing airworthiness record system

Completion of EASA Form 1

Incomplete maintenance

Maintenance check flight authorisation

Copy of CRS and EASA Form 1

Records

Airworthiness review procedures and records for ELA1 aircraft not involved in commercial operations Special procedures

Such as specialised tasks, disposal of unsalvageable components, re-certification of parts not having an EASA Form 1, etc.

Occurrence reporting

Occurrences to be reported

Timeframe of reports

Information to be reported

Recipients

Management of indirect approval of the manual

Amendments content eligible for indirect approval

Responsibility

Traceability

Information to the competent authority

Final validation

Part E – Appendices

Sample of all documents used.

List of maintenance locations.

List of Part-145 or M.A. Subpart F organisations.

List of subcontracted specialised services.

3.Approval

The competent authority should approve the manual in writing. This will normally be done by approving a list of effective pages.

Minor amendments, or amendments to a large capability list, can be approved indirectly, through a procedure approved by the member state.

4.Continuous compliance with Part-M and Part-ML

When a maintenance organisation manual no longer meets the requirements of this Part-M or Part-ML, whether through a change in Part-M or Part-ML, a change in the organisation or its activities, or through an inadequacy shown to exist by verification inspections conducted under the organisational review, or any other reason that affects the manuals conformity to requirements, the approved maintenance organisation is responsible to prepare and have approved an amendment to its manual.

5.Distribution

The manual describes how the organisation works therefore the manual or relevant parts thereof need to be distributed to all concerned staff in the organisation and contracted organisations.

APPENDIX · Appendix IV to AMC M.A.604 — Regulation (EU) No 1321/2014 · ED Decision 2020/002/R · Continuing Airworthiness Easy Access Rules · EAR revision 2 Sep 2025

All rules in APPENDICES TO AMC AND GM TO ANNEX I (Part-M)

Consolidated from the EASA Easy Access Rules (revision 2 Sep 2025, extracted 13 Oct 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.

Ask Metis about Appendix IV to AMC M.A.604 →

Metis opens with Avioverse in October 2026 · request early access.