---
title: "GM1 to AMC2 Article 3(6) (a) Provision of ATM/ANS and design of airspace structures — Cover Regulation, ATM/ANS · Avioverse"
description: "AERODROMES The aerodrome traffic zone should be linked to controlled aerodromes as potential aerodrome delineation."
url: "https://avioverse.aero/regulations/easa/atm-ans/cover-regulation/powers-and-recitals/gm1-to-amc2-article-3-6-a-provision-of-atm-ans-and-design-of-airspace-structures"
---

# GM1 to AMC2 Article 3(6) (a) Provision of ATM/ANS and design of airspace structures

Cover Regulation · Regulation (EU) 2017/373 · EAR revision 12 Mar 2025

GM Guidance material

## GM1 to AMC2 Article 3(6) (a) Provision of ATM/ANS and design of airspace structures

AERODROMES

The aerodrome traffic zone should be linked to controlled aerodromes as potential aerodrome delineation.

GM — Regulation (EU) 2017/373 · ED Decision 2020/008/R · ATM/ANS Easy Access Rules · EAR revision 12 Mar 2025

[All rules in Powers and recitals](https://avioverse.aero/regulations/easa/atm-ans/cover-regulation/powers-and-recitals)

Consolidated from the EASA Easy Access Rules (revision 12 Mar 2025, extracted 13 Oct 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.
