---
title: "ORO.FTL.110 Operator responsibilities — Part-ORO · Avioverse"
description: "An operator shall: publish duty rosters sufficiently in advance to provide the opportunity for crew members to plan adequate rest;"
url: "https://avioverse.aero/regulations/easa/air-ops/part-oro/subpart-ftl/oro-ftl-110"
---

# ORO.FTL.110 Operator responsibilities

ANNEX III (Part-ORO) · Regulation (EU) No 965/2012 · EAR revision 27 Mar 2026

IR Implementing rule

## ORO.FTL.110 Operator responsibilities

An operator shall:

(a) publish [duty](https://avioverse.aero/glossary/easa/duty) rosters sufficiently in advance to provide the opportunity for crew members to plan adequate rest;

(b) ensure that flight duty periods are planned in a way that enables crew members to remain sufficiently free from fatigue so that they can operate to a satisfactory level of safety under all circumstances;

(c) specify reporting times that allow sufficient time for ground duties;

(d) take into account the relationship between the frequency and pattern of flight duty periods and rest periods and give consideration to the cumulative effects of [undertaking](https://avioverse.aero/glossary/easa/undertaking) long duty hours combined with minimum rest periods;

(e) allocate duty patterns which avoid practices that cause a serious disruption of an established sleep/work pattern, such as alternating day/[night](https://avioverse.aero/glossary/easa/night) duties;

(f) comply with the provisions concerning disruptive schedules in accordance with ARO.OPS.230;

(g) provide rest periods of sufficient time to enable crew members to overcome the effects of the previous duties and to be rested by the start of the following flight [duty period](https://avioverse.aero/glossary/easa/duty-period);

(h) plan recurrent extended recovery rest periods and notify crew members sufficiently in advance;

(i) plan flight duties in order to be completed within the allowable flight duty period taking into account the time necessary for pre-flight duties, the [sector](https://avioverse.aero/glossary/easa/sector) and turnaround times;

(j) change a schedule and/or crew arrangements if the actual operation exceeds the maximum flight duty period on more than 33% of the flight duties in that schedule during a scheduled seasonal period.

IR · ORO.FTL.110 — Regulation (EU) No 965/2012 · Regulation (EU) No 83/2014 · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

AMC Acceptable means of compliance

## AMC1 ORO.FTL.110 Operator responsibilities

SCHEDULING

(a) Scheduling has an important impact on a [crew member](https://avioverse.aero/glossary/easa/crew-member)’s ability to sleep and to maintain a proper level of alertness. When developing a workable roster, the operator should strike a fair balance between the commercial needs and the capacity of individual crew members to work effectively. Rosters should be developed in such a way that they distribute the amount of work evenly among those that are involved.

(b) Schedules should allow for flights to be completed within the maximum permitted flight [duty period](https://avioverse.aero/glossary/easa/duty-period) and flight rosters should take into account the time needed for pre-flight duties, taxiing, the flight- and turnaround times. Other factors to be considered when planning [duty](https://avioverse.aero/glossary/easa/duty) periods should include:

(1) the allocation of work patterns which avoid undesirable practices such as alternating day/[night](https://avioverse.aero/glossary/easa/night) duties, alternating eastward-westward or westward-eastward time zone transitions, [positioning](https://avioverse.aero/glossary/easa/positioning) of crew members so that a serious disruption of established sleep/work patterns occurs;

(2) scheduling sufficient rest periods especially after long flights crossing many time zones; and

(3) preparation of duty rosters sufficiently in advance with planning of recurrent extended recovery rest periods and notification of the crew members well in advance to plan adequate pre-duty rest.

AMC · AMC1 ORO.FTL.110 — Regulation (EU) No 965/2012 · ED Decision 2014/017/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

AMC Acceptable means of compliance

## AMC1 ORO.FTL.110(a) Operator responsibilities

PUBLICATION OF ROSTERS

Rosters should be published 14 days in advance.

AMC · AMC1 ORO.FTL.110(a) — Regulation (EU) No 965/2012 · ED Decision 2014/017/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

AMC Acceptable means of compliance

## AMC1 ORO.FTL.110(j) Operator responsibilities

OPERATIONAL ROBUSTNESS OF ROSTERS

The operator should establish and monitor performance indicators for operational robustness of rosters.

AMC · AMC1 ORO.FTL.110(j) — Regulation (EU) No 965/2012 · ED Decision 2014/017/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

GM Guidance material

## GM1 ORO.FTL.110(j) Operator responsibilities

OPERATIONAL ROBUSTNESS OF ROSTERS

Performance indicators for operational robustness of rosters should support the operator in the assessment of the stability of its rostering system. Performance indicators for operational robustness of rosters should at least measure how often a rostered crew pairing for a [duty period](https://avioverse.aero/glossary/easa/duty-period) is achieved within the planned duration of that duty period. Crew pairing means rostered [positioning](https://avioverse.aero/glossary/easa/positioning) and flights for crew members in one duty period.

GM · GM1 ORO.FTL.110(j) — Regulation (EU) No 965/2012 · ED Decision 2014/017/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

[All rules in SUBPART FTL: FLIGHT AND DUTY TIME LIMITATIONS AND REST REQUIREMENTS](https://avioverse.aero/regulations/easa/air-ops/part-oro/subpart-ftl)

Consolidated from the EASA Easy Access Rules (revision 27 Mar 2026, extracted 13 Oct 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.
