---
title: "NCO.SPEC.105 Checklist — Part-NCO · Avioverse"
description: "Before commencing a specialised operation, the pilot-in-command shall conduct a risk assessment, assessing the complexity of the activity to determine…"
url: "https://avioverse.aero/regulations/easa/air-ops/part-nco/subpart-e/nco-spec-105"
---

# NCO.SPEC.105 Checklist

ANNEX VII (Part-NCO) · Regulation (EU) No 965/2012 · EAR revision 27 Mar 2026

IR Implementing rule

## NCO.SPEC.105 Checklist

(a) Before commencing a [specialised operation](https://avioverse.aero/glossary/easa/specialised-operation), the pilot-in-command shall conduct a risk assessment, assessing the complexity of the activity to determine the hazards and associated risks inherent in the operation and establish mitigating measures.

(b) A specialised operation shall be performed in accordance with a checklist. Based on the risk assessment, the pilot-in-command shall establish such checklist appropriate to the specialised activity and [aircraft](https://avioverse.aero/glossary/easa/aircraft) used, taking account of any section of this subpart.

(c) The checklist that is relevant to the duties of the pilot-in-command, crew members and task specialists shall be readily accessible on each flight.

(d) The checklist shall be regularly reviewed and updated, as appropriate.

IR · NCO.SPEC.105 — Regulation (EU) No 965/2012 · Regulation (EU) No 379/2014 · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

GM Guidance material

## GM1 NCO.SPEC.105 Checklist

DEVELOPMENT OF CHECKLISTS

For developing the checklist, the pilot-in-command should duly take into account at least the following items:

(a) nature and complexity of the activity:

(1) the nature of the flight and the risk exposure, e.g. low height;

(2) the complexity of the activity taking into account the necessary pilot skills and level of experience, ground support, safety and individual protective equipment;

(3) the operational environment and geographical area, e.g., congested [hostile environment](https://avioverse.aero/glossary/easa/hostile-environment), mountainous areas, sea areas, or desert areas;

(4) the result of the risk assessment and evaluation;

(b) [aircraft](https://avioverse.aero/glossary/easa/aircraft) and equipment:

(1) the category of aircraft to be used for the activity should be indicated, e.g. [helicopter](https://avioverse.aero/glossary/easa/helicopter)/[gyroplane](https://avioverse.aero/glossary/easa/gyroplane)/[aeroplane](https://avioverse.aero/glossary/easa/aeroplane), single-/multi-engined;

(2) all equipment required for the activity should be listed;

(c) crew members:

(1) crew composition;

(2) minimum crew experience and training provisions; and

(3) recency provisions;

(d) task specialists:

(1) description of the task specialists’ function(s)

(2) minimum crew experience and training provisions; and

(3) recency provisions;

(4) briefing;

(e) aircraft performance:

this chapter should detail the specific performance requirements to be applied, in order to ensure an adequate power margin;

(f) normal procedures and emergency procedures:

(1) operating procedures for the flight crew, including the coordination with task specialists;

(2) ground procedures for the task specialists;

(g) ground equipment:

this chapter should detail the nature, number and location of ground equipment required for the activity;

(h) records:

it should be determined which records specific to these flight(s) are to be kept, such as task details, aircraft registration, pilot-in-command, flight times, weather and any remarks, including a record of occurrences affecting flight safety or the safety of persons or property on the ground.

GM · GM1 NCO.SPEC.105 — Regulation (EU) No 965/2012 · ED Decision 2025/023/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

GM Guidance material

## GM2 NCO.SPEC.105 Checklists

TEMPLATE FORMS

The following templates are examples, which could be used for developing checklist.

(a) Template Form A — Risk assessment (RA)

| Date: RA of Responsible:                                                                                                                                                                                  |
| --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Purpose:                                                                                                                                                                                                  |
| Type of operation and brief description:                                                                                                                                                                  |
| Participants, working group:                                                                                                                                                                              |
| Preconditions, assumptions and simplifications:                                                                                                                                                           |
| Data used:                                                                                                                                                                                                |
| Description of the analysis method:                                                                                                                                                                       |
| External context:                                                                                                                                                                                         |
| Regulatory requirements Approvals Environmental conditions (visibility, wind, turbulence, contrast, light, elevation, etc.; unless evident from the checklists) Stakeholders and their potential interest |
| Internal context:                                                                                                                                                                                         |
| Type(s) of [aircraft](https://avioverse.aero/glossary/easa/aircraft) Personnel and qualifications Combination/similarity with other operations/SOPs Other RA used/considered/plugged in                   |
| Existing barriers and emergency preparedness:                                                                                                                                                             |
| Monitoring and follow up:                                                                                                                                                                                 |
| Description of the risk:                                                                                                                                                                                  |
| Risk evaluation:                                                                                                                                                                                          |
| Conclusions:                                                                                                                                                                                              |

(b) Template Form B — Hazard identification (HI)

Date: HI of Responsible:

| Phase of operation | Haz ref | Hazard / accidental event | Cause / threat | Current Treatment Measures (TM) | Further treatment required | TM ref | Comment |
| ------------------ | ------- | ------------------------- | -------------- | ------------------------------- | -------------------------- | ------ | ------- |
|                    |         |                           |                |                                 |                            |        |         |
|                    |         |                           |                |                                 |                            |        |         |
|                    |         |                           |                |                                 |                            |        |         |
|                    |         |                           |                |                                 |                            |        |         |
|                    |         |                           |                |                                 |                            |        |         |
|                    |         |                           |                |                                 |                            |        |         |
|                    |         |                           |                |                                 |                            |        |         |

Haz ref: A unique number for hazards, e.g., for use in a database

TM ref: A unique number for the treatment method

(c) Template Form C — Mitigating measures

Date:……………….. RA of Responsible:………………………

| Phase of operation | Haz ref | Hazard/ accidental event | Current Treatment Measures (TM)/ controls | TM ref | L | C | Further treatment required |
| ------------------ | ------- | ------------------------ | ----------------------------------------- | ------ | - | - | -------------------------- |
|                    |         |                          |                                           |        |   |   |                            |
|                    |         |                          |                                           |        |   |   |                            |
|                    |         |                          |                                           |        |   |   |                            |
|                    |         |                          |                                           |        |   |   |                            |
|                    |         |                          |                                           |        |   |   |                            |
|                    |         |                          |                                           |        |   |   |                            |
|                    |         |                          |                                           |        |   |   |                            |

Haz ref: A unique number for hazards, e.g., for use in a database

TM ref: A unique number for the treatment method

L: Likelihood (probability)

C: Consequence

(d) Template register A — Risk register

| Ref | Operation/ Procedure | Ref | Generic hazard | Ref | Accidental event | Treatment/ control | L | C | Monitoring |
| --- | -------------------- | --- | -------------- | --- | ---------------- | ------------------ | - | - | ---------- |
|     |                      |     |                |     |                  |                    |   |   |            |
|     |                      |     |                |     |                  |                    |   |   |            |
|     |                      |     |                |     |                  |                    |   |   |            |
|     |                      |     |                |     |                  |                    |   |   |            |
|     |                      |     |                |     |                  |                    |   |   |            |
|     |                      |     |                |     |                  |                    |   |   |            |
|     |                      |     |                |     |                  |                    |   |   |            |

L: Likelihood (probability)

C: Consequence

GM · GM2 NCO.SPEC.105 — Regulation (EU) No 965/2012 · ED Decision 2014/016/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

[All rules in SUBPART E: SPECIFIC REQUIREMENTS](https://avioverse.aero/regulations/easa/air-ops/part-nco/subpart-e)

Consolidated from the EASA Easy Access Rules (revision 27 Mar 2026, extracted 13 Oct 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.
