---
title: "NCC.OP.115 Departure and approach procedures — Part-NCC · Avioverse"
description: "The pilot-in-command shall use the departure and approach procedures established by the State of the aerodrome, if such procedures have been published…"
url: "https://avioverse.aero/regulations/easa/air-ops/part-ncc/subpart-b/ncc-op-115"
---

# NCC.OP.115 Departure and approach procedures

ANNEX VI (Part-NCC) · Regulation (EU) No 965/2012 · EAR revision 27 Mar 2026

IR Implementing rule

## NCC.OP.115 Departure and approach procedures

(a) The pilot-in-command shall use the departure and approach procedures established by the State of the aerodrome, if such procedures have been published for the runway or FATO to be used.

(b) Notwithstanding (a), the pilot-in-command shall only accept an ATC clearance to deviate from a published procedure:

(1) provided that obstacle clearance criteria are observed and full account is taken of the operating conditions; or

(2) when being radar-vectored by an ATC unit.

(c) In any case, the final approach segment shall be flown visually or in accordance with the published approach procedures.

IR · NCC.OP.115 — Regulation (EU) No 965/2012 · Regulation (EU) No 800/2013 · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

AMC Acceptable means of compliance

## AMC1 NCC.OP.115 Departure and approach procedures

APPROACH FLIGHT TECHNIQUE — AEROPLANES

(a) All approach operations should be flown as SAp operations.

(b) The CDFA technique should be used for NPA procedures.

AMC · AMC1 NCC.OP.115 — Regulation (EU) No 965/2012 · ED Decision 2022/012/R · Air OPS Easy Access Rules · EAR revision 27 Mar 2026

[All rules in SUBPART B: OPERATIONAL PROCEDURES](https://avioverse.aero/regulations/easa/air-ops/part-ncc/subpart-b)

Consolidated from the EASA Easy Access Rules (revision 27 Mar 2026, extracted 13 Oct 2026) for convenience. Not the official publication — verify against the Official Journal of the European Union and the EASA publications before operational use.
