Skip to content

Avioverse is opening gradually — request early access.

Obligations · Annex Vc

Part-CAMO obligations

Approval of organisations that manage the continuing airworthiness of aircraft and components.

127 obligations from 21 rules108 must · 17 may · 2 must notChecked against the text in force on 2 Nov 2026

127 obligations

How to read this page
Must · May · Must not
A duty, a permission, a prohibition — as the rule words it.
The action
What to do, in plain words, with the rule's own terms kept.
If, When, For …
The condition or exception that limits it. Check it first.
When
Always (a standing condition) · On an event (something happens, or before you act) · Periodically · Once.
Time limit
The deadline, interval or retention period the rule sets.
Rule text
The exact sentence the obligation comes from. It is what binds; read it before relying on the summary.
Show what applies to
A viewpoint, not a profile — switch it any time, or share the link.

CAMO.A.115Application for an organisation certificate

3 obligations · Rule text

  • Must

    Submit the certificate or amendment application in the competent authority’s established form and manner, taking account of the applicable Part-M, Part-ML and Part-CAMO requirements.

    When applying for a certificate or an amendment to an existing certificate.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.115(a)

    (a)The application for a certificate or an amendment to an existing certificate in accordance with this Annex shall be made in a form and manner established by the competent authority, taking into account the applicable requirements of Annex I (Part-M), Annex Vb (Part-ML) and this Annex.

    CAMO.A.115(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Provide the competent authority with the organisation’s pre-audit results against the applicable requirements of Part-M, Part-ML and Part-CAMO.

    When applying for an initial certificate.

    Who
    CAMO
    When
    Once
    Rule text CAMO.A.115(b)(1)

    (b)Applicants for an initial certificate pursuant to this Annex shall provide the competent authority with: (1) the results of a pre-audit performed by the organisation against the applicable requirements provided for in Annex I (Part-M), Annex Vb (Part-ML) and this Annex;

    CAMO.A.115(b)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Provide the competent authority with documentation demonstrating how the organisation will comply with this Regulation, including the CAMO.A.130 procedure for managing and notifying changes not requiring prior approval.

    When applying for an initial certificate.

    Who
    CAMO
    When
    Once
    Rule text CAMO.A.115(b)(2)

    (2)documentation demonstrating how they will comply with the requirements established in this Regulation. Such documentation shall include, as provided for in point CAMO.A.130, a procedure describing how changes not requiring prior approval will be managed and notified to the competent authority.

    CAMO.A.115(b)(2) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.120Means of compliance

2 obligations · Rule text

  • May

    Use alternative means of compliance to the adopted AMC to establish compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts.

    After competent authority approval and receipt of the notification under CAMO.B.120.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.120(a)

    (a)Alternative means of compliance to the AMC adopted by the Agency may be used by an organisation to establish compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts. (b) When an organisation wishes to use an alternative means of compliance, it shall, prior to using it, provide the competent authority with a full description of the alternative means of compliance. The description shall include any revisions to manuals or procedures that may be relevant, as well as an assessment demonstrating compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts. The organisation may use these alternative means of compliance subject to prior approval by the competent authority, and upon receipt of the notification as provided for in point CAMO.B.120.

    CAMO.A.120(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Provide the competent authority with a full alternative means of compliance description, including relevant manual or procedure revisions and an assessment demonstrating compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts.

    Before using alternative means of compliance.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.120(b)

    When an organisation wishes to use an alternative means of compliance, it shall, prior to using it, provide the competent authority with a full description of the alternative means of compliance. The description shall include any revisions to manuals or procedures that may be relevant, as well as an assessment demonstrating compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts.

    CAMO.A.120(b) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.125Terms of approval and privileges of the organisation

15 obligations · Rule text

  • Must

    Have the approval included in the air operator certificate for the aircraft operated.

    For air carriers licensed under Regulation (EC) No 1008/2008, unless the CAMO is contracted by operators forming a single air carrier business grouping under M.A.201(ea).

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(b)

    (b)Notwithstanding point (a), for air carriers licensed in accordance with Regulation (EC) No 1008/2008, the approval shall be part of the air operator certificate issued by the competent authority for the aircraft operated except when, in accordance with point M.A.201(ea) of Annex I (Part-M), the CAMO is contracted by operators forming part of a single air carrier business grouping.

    CAMO.A.125(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Specify the scope of work in the CAME in accordance with CAMO.A.300.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(c)

    (c)The scope of work shall be specified in the continuing airworthiness management exposition (CAME) in accordance with point CAMO.A.300.

    CAMO.A.125(c) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Manage the continuing airworthiness of aircraft listed on the organisation’s certificate.

    For aircraft other than those used by air carriers licensed in accordance with Regulation (EC) No 1008/2008.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(d)(1)

    (d)An organisation approved in accordance with this Annex may: (1) manage the continuing airworthiness of aircraft, except those used by air carriers licensed in accordance with Regulation (EC) No 1008/2008, as listed on the certificate;

    CAMO.A.125(d)(1) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Manage the continuing airworthiness of the aircraft.

    For aircraft used by air carriers licensed under Regulation (EC) No 1008/2008, when listed on both the organisation’s certificate and air operator certificate or M.A.201(ea) applies.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(d)(2)

    (2)manage the continuing airworthiness of aircraft used by air carriers licensed in accordance with Regulation (EC) No 1008/2008, when listed both on its certificate and on the air operator certificate or when M.A.201(ea) applies;

    CAMO.A.125(d)(2) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Arrange limited continuing airworthiness tasks with subcontracted organisations working under the organisation’s management system, as listed on the certificate.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(d)(3)

    (3)arrange to carry out limited continuing airworthiness tasks with any subcontracted organisation, working under its management system, as listed on the certificate;

    CAMO.A.125(d)(3) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Extend the validity of an existing airworthiness review certificate in accordance with M.A.902(a) or ML.A.902(a), as applicable.

    If the conditions in M.A.902(b) or ML.A.902(b), as applicable, are met.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.125(d)(4)

    (4)extend the validity of an existing airworthiness review certificate in accordance with point M.A.902(a) of Annex I (Part-M) or point ML.A.902(a) of Annex Vb (Part-ML), as applicable, subject to the conditions set out in point M.A.902(b) of Annex I (Part-M) or point ML.A.902(b) of Annex Vb (Part-ML), as applicable.

    CAMO.A.125(d)(4) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Approve the AMP in accordance with ML.A.302(b)(2).

    For aircraft managed in accordance with Part-ML.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.125(d)(5)

    (5)approve the AMP, in accordance with point (b)(2) of point ML.A.302, for aircraft managed in accordance with Annex Vb (Part-ML).

    CAMO.A.125(d)(5) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Obtain additional approval to carry out airworthiness reviews in accordance with M.A.903 or ML.A.903, as applicable.

    For an approved organisation with its principal place of business in a Member State.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(e)

    (e)An organisation approved in accordance with this Annex and having its principal place of business in a Member State may additionally be approved to carry out airworthiness reviews in accordance with point M.A.903 of Annex I (Part-M) or point ML.A.903 of Annex Vb (Part-ML), as applicable, and:

    CAMO.A.125(e) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Issue the related airworthiness review certificate under M.A.901(b)(1) or in accordance with ML.A.901(b), as applicable.

    If approved under CAMO.A.125(e).

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.125(e)(1)

    (e)An organisation approved in accordance with this Annex and having its principal place of business in a Member State may additionally be approved to carry out airworthiness reviews in accordance with point M.A.903 of Annex I (Part-M) or point ML.A.903 of Annex Vb (Part-ML), as applicable, and: (1) issue the related airworthiness review certificate under the conditions set out in point M.A.901(b)(1) of Annex I (Part-M) or in accordance with point ML.A.901(b) of Annex Vb (Part-ML), as applicable;

    CAMO.A.125(e)(1) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Issue a recommendation for an airworthiness review certificate to the competent authority of the Member State of registry under the conditions in M.A.901(b)(2).

    If approved under CAMO.A.125(e).

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.125(e)(2)

    (e)An organisation approved in accordance with this Annex and having its principal place of business in a Member State may additionally be approved to carry out airworthiness reviews in accordance with point M.A.903 of Annex I (Part-M) or point ML.A.903 of Annex Vb (Part-ML), as applicable, and: (1) issue the related airworthiness review certificate under the conditions set out in point M.A.901(b)(1) of Annex I (Part-M) or in accordance with point ML.A.901(b) of Annex Vb (Part-ML), as applicable; (2) issue a recommendation for the issuance of an airworthiness review certificate to the competent authority of the Member State of registry, under the conditions set out in point M.A.901(b)(2) of Annex I (Part-M).

    CAMO.A.125(e)(2) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Obtain additional approval to issue permits to fly under 21.A.711(d) for aircraft covered by the organisation’s airworthiness review approval.

    If holding CAMO.A.125(e) privileges, attesting conformity with approved flight conditions and using an adequate CAME procedure under CAMO.A.300.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(f)

    (f)An organisation holding the privileges referred to in point (e) of this point may additionally be approved to issue a permit to fly in accordance with point 21.A.711(d) of Annex I (Part 21) to Regulation (EU) No 748/2012 for the aircraft for which the organisation is approved to carry out the airworthiness review, when the organisation attests conformity with the approved flight conditions, subject to an adequate procedure in the CAME referred to in point CAMO.A.300 of this Annex.

    CAMO.A.125(f) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Issue a permit to fly only when M.A.902(b)(1) and M.A.902(b)(2) are met and the issuing CAMO manages the aircraft’s continuing airworthiness.

    For permits under CAMO.A.125(f) for aircraft used by air carriers licensed under Regulation (EC) No 1008/2008, or aircraft above 2 730 kg MTOM.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.125(f)

    In addition, in the case of aircraft used by air carriers licensed in accordance with Regulation (EC) No 1008/2008, or for aircraft above 2 730 kg MTOM, that permit to fly may be issued provided that: (i) the conditions referred to in points M.A.902(b)(1) and M.A.902(b)(2) are met; (ii) the continuing airworthiness of the aircraft is managed by the CAMO issuing the permit to fly.

    CAMO.A.125(f) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Obtain additional approval to develop an evaluation programme in accordance with 21.A.174(d)(3) or 21L.A.143(h)(3), as applicable.

    If holding CAMO.A.125(e) privileges, for aircraft covered by the organisation’s airworthiness review approval and subject to an adequate CAME procedure under CAMO.A.300.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(g)(1)

    (g)An organisation holding the privileges referred to in point (e) may additionally, for the aircraft for which the organisation is approved to carry out the airworthiness review, and subject to an adequate procedure in the CAME referred to in point CAMO.A.300, be approved to: (1) develop an evaluation programme in accordance with point 21.A.174(d)(3) of Annex I (Part 21) or, as applicable, point 21L.A.143(h)(3) of Annex Ib (Part 21 Light) to Regulation (EU) No 748/2012;

    CAMO.A.125(g)(1) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Obtain additional approval to conduct the investigation activities proposed in the evaluation programme and issue the evaluation report in accordance with 21.A.174(d)(4) or 21L.A.143(h)(4), as applicable.

    If holding CAMO.A.125(e) privileges, for aircraft covered by the organisation’s airworthiness review approval and subject to an adequate CAME procedure under CAMO.A.300.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(g)(2)

    (g)An organisation holding the privileges referred to in point (e) may additionally, for the aircraft for which the organisation is approved to carry out the airworthiness review, and subject to an adequate procedure in the CAME referred to in point CAMO.A.300, be approved to: (1) develop an evaluation programme in accordance with point 21.A.174(d)(3) of Annex I (Part 21) or, as applicable, point 21L.A.143(h)(3) of Annex Ib (Part 21 Light) to Regulation (EU) No 748/2012; (2) conduct the investigations activities proposed in the evaluation programme and issue the evaluation report in accordance with point 21.A.174(d)(4) of Annex I (Part 21) or, as applicable, point 21L.A.143(h)(4) of Annex Ib (Part 21 Light) to Regulation (EU) No 748/2012.

    CAMO.A.125(g)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure the tasks under CAMO.A.125(g)(1) and CAMO.A.125(g)(2) are performed by staff approved to carry out airworthiness reviews for that aircraft.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.125(g)

    Tasks referred to in the first paragraph, points (1) and (2), shall be performed by staff who are approved to carry out airworthiness review for that aircraft.

    CAMO.A.125(g) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.130Changes to the organisation

6 obligations · Rule text

  • Must

    Obtain prior approval for changes to certificate scope or approval terms, CAMO.A.305(a)(3) to (a)(5) or (b)(2) personnel or their reporting lines to the accountable manager, or the CAMO.A.130(c) procedure.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.130(a)

    (a)The following changes to the organisation shall require prior approval: (1) changes that affect the scope of the certificate or the terms of approval of the organisation; (2) changes to personnel nominated in accordance with points (a)(3) to (a)(5) and (b)(2) of point CAMO.A.305; (3) changes to the reporting lines between the personnel nominated in accordance with points (a)(3) to (a)(5) and (b)(2) of point CAMO.A.305, and the accountable manager; (4) the procedure as regards changes not requiring prior approval referred to in point (c).

    CAMO.A.130(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Apply for and obtain approval from the competent authority.

    For changes requiring prior approval under Regulation (EU) 2018/1139 and its delegated and implementing acts.

    Who
    CAMO
    When
    On an event
    Time limit
    before the change takes place
    Rule text CAMO.A.130(b)

    For any changes requiring prior approval in accordance with Regulation (EU) 2018/1139 and its delegated and implementing acts, the organisation shall apply for and obtain an approval issued by the competent authority. The application shall be submitted before any such change takes place, in order to enable the competent authority to determine continued compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts and to amend, if necessary, the organisation certificate and related terms of approval attached to it.

    CAMO.A.130(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Provide the competent authority with all relevant documentation.

    For changes requiring prior approval under Regulation (EU) 2018/1139 and its delegated and implementing acts.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.130(b)

    The organisation shall provide the competent authority with any relevant documentation.

    CAMO.A.130(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Implement the change only after receiving formal competent authority approval under CAMO.B.330.

    For changes requiring prior approval.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.130(b)

    The change shall only be implemented upon receipt of formal approval by the competent authority in accordance with point CAMO.B.330.

    CAMO.A.130(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Operate under the conditions established by the competent authority, as applicable.

    When undergoing changes requiring prior approval.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.130(b)

    The organisation shall operate under the conditions established by the competent authority during such changes, as applicable.

    CAMO.A.130(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Manage changes and notify the competent authority under the CAMO.A.115(b) procedure approved in accordance with CAMO.B.310(h).

    For changes not requiring prior approval.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.130(c)

    (c)All changes not requiring prior approval shall be managed and notified to the competent authority as defined in the procedure referred to in point (b) of point CAMO.A.115 and approved by the competent authority in accordance with point (h) of point CAMO.B.310.

    CAMO.A.130(c) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.135Continued validity

3 obligations · Rule text

  • Must

    Remain in compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts, taking account of the handling of findings under CAMO.B.350.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.135(a)(1)

    (a)The organisation’s certificate shall remain valid subject to compliance with all of the following conditions: (1) the organisation remaining in compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts, taking into account the provisions related to the handling of findings as specified under point CAMO.B.350;

    CAMO.A.135(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Grant the competent authority access in accordance with CAMO.A.140.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.135(a)(2)

    (2)the competent authority being granted access to the organisation as specified in point CAMO.A.140;

    CAMO.A.135(a)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Return the organisation certificate to the competent authority.

    After revocation or surrender of the organisation certificate.

    Who
    CAMO
    When
    On an event
    Time limit
    without delay
    Rule text CAMO.A.135(d)

    (d)Upon revocation or surrender, the organisation certificate shall be returned to the competent authority without delay.

    CAMO.A.135(d) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.140Access

1 obligation · Rule text

  • Must

    Grant persons authorised under CAMO.A.140(a) or (b) access at any time to facilities, aircraft, documents, records, data, procedures and other material relevant to certified activities, including contracted and subcontracted activities.

    For determining compliance with Regulation (EU) 2018/1139 and its delegated and implementing acts.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.140

    For the purpose of determining compliance with the relevant requirements of Regulation (EU) 2018/1139 and its delegated and implementing acts, the organisation shall grant access at any time to any facility, aircraft, document, records, data, procedures or any other material relevant to its activity subject to certification, whether it is contracted/subcontracted or not, to any person authorised by one of the following authorities: (a) the competent authority defined in point CAMO.A.105; (b) the authority acting under the provisions of point (d) of point CAMO.B.300 or point (e) of point CAMO.B.300.

    CAMO.A.140 · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.150Findings

3 obligations · Rule text

  • Must

    Identify root causes and contributing factors of the non-compliance.

    After receiving notification of findings under CAMO.B.350.

    Who
    CAMO
    When
    On an event
    Time limit
    within the period agreed with the competent authority
    Rule text CAMO.A.150(a)(1)

    (a)After receipt of notification of findings according to point CAMO.B.350, the organisation shall: (1) identify the root cause or causes of and contributing factors to the non-compliance; (2) define a corrective action plan; (3) demonstrate corrective action implementation to the satisfaction of the competent authority. (b) Actions referred to in points (a)(1), (a)(2) and (a)(3) shall be performed within the period agreed with that competent authority as defined in point CAMO.B.350.

    CAMO.A.150(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Define a corrective action plan for the non-compliance.

    After receiving notification of findings under CAMO.B.350.

    Who
    CAMO
    When
    On an event
    Time limit
    within the period agreed with the competent authority
    Rule text CAMO.A.150(a)(2)

    (a)After receipt of notification of findings according to point CAMO.B.350, the organisation shall: (1) identify the root cause or causes of and contributing factors to the non-compliance; (2) define a corrective action plan; (3) demonstrate corrective action implementation to the satisfaction of the competent authority. (b) Actions referred to in points (a)(1), (a)(2) and (a)(3) shall be performed within the period agreed with that competent authority as defined in point CAMO.B.350.

    CAMO.A.150(a)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Demonstrate corrective action implementation to the satisfaction of the competent authority.

    After receiving notification of findings under CAMO.B.350.

    Who
    CAMO
    When
    On an event
    Time limit
    within the period agreed with the competent authority
    Rule text CAMO.A.150(a)(3)

    (a)After receipt of notification of findings according to point CAMO.B.350, the organisation shall: (1) identify the root cause or causes of and contributing factors to the non-compliance; (2) define a corrective action plan; (3) demonstrate corrective action implementation to the satisfaction of the competent authority. (b) Actions referred to in points (a)(1), (a)(2) and (a)(3) shall be performed within the period agreed with that competent authority as defined in point CAMO.B.350.

    CAMO.A.150(a)(3) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.155Immediate reaction to a safety problem

1 obligation · Rule text

  • Must

    Implement safety measures mandated by the competent authority under CAMO.B.135 and relevant mandatory safety information issued by the Agency.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.155

    The organisation shall implement: (a) any safety measures mandated by the competent authority in accordance with point CAMO.B.135; (b) any relevant mandatory safety information issued by the Agency.

    CAMO.A.155 · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.160Occurrence reporting

9 obligations · Rule text

  • Must

    Establish and maintain an occurrence reporting system within the management system, including mandatory and voluntary reporting.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.160(a)

    As part of its management system, the organisation shall establish and maintain an occurrence reporting system, including mandatory and voluntary reporting.

    CAMO.A.160(a) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Use a single system to meet the requirements of Regulation (EU) No 376/2014, Regulation (EU) 2018/1139 and their delegated and implementing acts.

    For organisations with their principal place of business in a Member State.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.160(a)

    For organisations that have their principal place of business in a Member State, a single system may be established to meet the requirements of Regulation (EU) No 376/2014 and its delegated and implementing acts and of Regulation (EU) 2018/1139 and its delegated and implementing acts.

    CAMO.A.160(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Report any identified safety-related event or condition of an aircraft or component, particularly accidents or serious incidents, to the competent authority and the organisation responsible for the aircraft’s or component’s design.

    If it endangers, or could endanger unless corrected or addressed, an aircraft, its occupants or any other person.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.160(b)

    (b)The organisation shall report to its competent authority and to the organisation responsible for the design of the aircraft or component any safety-related event or condition of an aircraft or component identified by the organisation which endangers or, if not corrected or addressed, could endanger an aircraft, its occupants or any other person, and in particular any accident or serious incident.

    CAMO.A.160(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Report safety-related events or conditions under CAMO.A.160(b) to the aircraft’s owner or operator.

    When identified while managing continuing airworthiness in accordance with M.A.201 or ML.A.201, as applicable.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.160(c)(1)

    (c)The organisation shall also report any such event or condition that affects an aircraft or component, as applicable: (1) to the owner or operator of that aircraft, when such event or condition was identified while managing the continuing airworthiness in accordance with point M.A.201 of Annex I (Part-M) or point ML.A.201 of Annex Vb (Part-ML), as applicable;

    CAMO.A.160(c)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Report safety-related events or conditions under CAMO.A.160(b) to the person or organisation responsible for continuing airworthiness under M.A.201 or ML.A.201, as applicable.

    When identified during continuing airworthiness activities requested by that person or organisation.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.160(c)(2)

    (2)to the person or organisation that is responsible for the continuing airworthiness of that aircraft in accordance with point M.A.201 of Annex I (Part-M) or point ML.A.201 of Annex Vb (Part-ML), as applicable, when such event or condition was identified while carrying out continuing airworthiness activities requested by that person or organisation.

    CAMO.A.160(c)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Safeguard appropriately the confidentiality of the reporter’s identity and the identities of persons mentioned in the initial mandatory report.

    For organisations without their principal place of business in a Member State.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.160(d)(1)(i)

    (d)For organisations that do not have their principal place of business in a Member State: (1) the initial mandatory report shall: (i) appropriately safeguard the confidentiality of the identity of the reporter and of the persons mentioned in the report; (ii) be made as soon as practicable, but in any case, within 72 hours after the organisation has become aware of the occurrence unless exceptional circumstances prevent that; (iii) be made in a form and manner established by the competent authority; (iv) contain all pertinent information about the condition known to the organisation;

    CAMO.A.160(d)(1)(i) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Submit the initial mandatory report to the applicable recipients under CAMO.A.160(b) and CAMO.A.160(c).

    For organisations without their principal place of business in a Member State, unless exceptional circumstances prevent that.

    Who
    CAMO
    When
    On an event
    Time limit
    as soon as practicable and within 72 hours of awareness
    Rule text CAMO.A.160(d)(1)(ii)

    (d)For organisations that do not have their principal place of business in a Member State: (1) the initial mandatory report shall: (i) appropriately safeguard the confidentiality of the identity of the reporter and of the persons mentioned in the report; (ii) be made as soon as practicable, but in any case, within 72 hours after the organisation has become aware of the occurrence unless exceptional circumstances prevent that; (iii) be made in a form and manner established by the competent authority; (iv) contain all pertinent information about the condition known to the organisation;

    CAMO.A.160(d)(1)(ii) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Make the initial mandatory report in the competent authority’s established form and manner, including all pertinent information about the condition known to the organisation.

    For organisations without their principal place of business in a Member State.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.160(d)(1)(iii)

    (d)For organisations that do not have their principal place of business in a Member State: (1) the initial mandatory report shall: (i) appropriately safeguard the confidentiality of the identity of the reporter and of the persons mentioned in the report; (ii) be made as soon as practicable, but in any case, within 72 hours after the organisation has become aware of the occurrence unless exceptional circumstances prevent that; (iii) be made in a form and manner established by the competent authority; (iv) contain all pertinent information about the condition known to the organisation;

    CAMO.A.160(d)(1)(iii) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Send a follow-up report detailing intended actions to prevent similar occurrences to the initial recipients under CAMO.A.160(b) and CAMO.A.160(c), in the competent authority’s established form and manner.

    For organisations without their principal place of business in a Member State, when relevant.

    Who
    CAMO
    When
    On an event
    Time limit
    as soon as those actions have been identified
    Rule text CAMO.A.160(d)(2)

    (2)where relevant, a follow-up report that provides details of the actions that the organisation intends to take to prevent similar occurrences in the future shall be made as soon as those actions have been identified; those follow-up reports shall: (i) be sent to the entities referred to in points (b) and (c) to which the initial report was sent; (ii) be made in a form and manner established by the competent authority.

    CAMO.A.160(d)(2) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.200Management system

11 obligations · Rule text

  • Must

    Establish, implement and maintain a management system with clear lines of responsibility and accountability throughout the organisation, including direct safety accountability of the accountable manager.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(a)(1)

    (a)The organisation shall establish, implement, and maintain a management system that includes: (1) clearly defined lines of responsibility and accountability throughout the organisation, including a direct safety accountability of the accountable manager;

    CAMO.A.200(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Describe the organisation’s overall safety philosophies and principles in a safety policy within the management system.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(a)(2)

    (2)a description of the overall philosophies and principles of the organisation with regard to safety, referred to as the safety policy;

    CAMO.A.200(a)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Identify aviation safety hazards arising from the organisation’s activities, evaluate and manage associated risks, take mitigating action and verify its effectiveness.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(a)(3)

    (3)the identification of aviation safety hazards entailed by the activities of the organisation, their evaluation and the management of associated risks, including taking actions to mitigate the risks and verify their effectiveness;

    CAMO.A.200(a)(3) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Maintain personnel trained and competent to perform their tasks.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(a)(4)

    (4)maintaining personnel trained and competent to perform their tasks;

    CAMO.A.200(a)(4) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Document all management system key processes, including a process to make personnel aware of their responsibilities and a procedure for amending the documentation.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(a)(5)

    (5)documentation of all management system key processes, including a process for making personnel aware of their responsibilities and the procedure for amending this documentation;

    CAMO.A.200(a)(5) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Maintain a function monitoring compliance with relevant requirements, including feedback of findings to the accountable manager to ensure effective implementation of corrective actions as necessary.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(a)(6)

    (6)a function to monitor compliance of the organisation with the relevant requirements. Compliance monitoring shall include a feedback system of findings to the accountable manager to ensure effective implementation of corrective actions as necessary;

    CAMO.A.200(a)(6) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Include any additional requirements laid down in this Regulation in the management system.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(a)(7)

    (7)any additional requirements that are laid down in this Regulation.

    CAMO.A.200(a)(7) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Match the management system to the organisation’s size and the nature and complexity of its activities, taking account of their inherent hazards and associated risks.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(b)

    (b)The management system shall correspond to the size of the organisation and the nature and complexity of its activities, taking into account the hazards and associated risks inherent in these activities.

    CAMO.A.200(b) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Integrate the management system with that required under additional organisation certificates held.

    If holding additional certificates within Regulation (EU) 2018/1139 and its delegated and implementing acts, subject to CAMO.A.200(d).

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(c)

    (c)Where the organisation holds one or more additional organisation certificates within the scope of Regulation (EU) 2018/1139 and its delegated and implementing acts, the management system may be integrated with that required under the additional certificate(s) held. (d) Notwithstanding point (c), for air carriers licensed in accordance with Regulation (EC) No 1008/2008, the management system provided for in this Annex shall be an integrated part of the operator’s management system.

    CAMO.A.200(c) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Make the Part-CAMO management system an integrated part of the operator’s management system.

    For air carriers licensed in accordance with Regulation (EC) No 1008/2008.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(d)

    (d)Notwithstanding point (c), for air carriers licensed in accordance with Regulation (EC) No 1008/2008, the management system provided for in this Annex shall be an integrated part of the operator’s management system.

    CAMO.A.200(d) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure the CAMO’s management system is harmonised with the management systems of the operators in the business grouping.

    When contracted under M.A.201(ea) by operators forming part of a single air carrier business grouping.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200(e)

    (e)When, in accordance with point M.A.201(ea) of Annex I (Part-M), a contract is concluded between a CAMO and operators forming part of a single air carrier business grouping, the CAMO shall ensure that its management system is harmonised with the management systems of the operators forming part of that business grouping.

    CAMO.A.200(e) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.200AInformation security management system

1 obligation · Rule text

  • Must

    Establish, implement and maintain an information security management system in accordance with Implementing Regulation (EU) 2023/203, additional to CAMO.A.200, to ensure proper management of information security risks that may affect aviation safety.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.200A

    In addition to the management system referred to in point CAMO.A.200, the organisation shall establish, implement and maintain an information security management system in accordance with Implementing Regulation (EU) 2023/203 in order to ensure the proper management of information security risks which may have an impact on aviation safety.

    CAMO.A.200A · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.202Internal safety reporting scheme

5 obligations · Rule text

  • Must

    Establish an internal safety reporting scheme within the management system to collect and evaluate CAMO.A.160 occurrences and other internally reported errors, near misses and hazards.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.202(a)

    (a)As part of its management system, the organisation shall establish an internal safety reporting scheme to enable the collection and evaluation of such occurrences to be reported under point CAMO.A.160. (b) The scheme shall also enable the collection and evaluation of those errors, near misses, and hazards reported internally that do not fall under point (a).

    CAMO.A.202(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Identify causes and contributing factors of reported errors, near misses and hazards, and address them through safety risk management in accordance with CAMO.A.200(a)(3).

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.202(c)(1)

    (c)Through this scheme, the organisation shall: (1) identify the causes of and contributing factors to any errors, near misses, and hazards reported and address them as part of safety risk management in accordance with point (a)(3) of point CAMO.A.200;

    CAMO.A.202(c)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure evaluation of all known relevant information about errors, inability to follow procedures, near misses and hazards, and a method to circulate it as necessary.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.202(c)(2)

    (2)ensure evaluation of all known, relevant information relating to errors, the inability to follow procedures, near misses, and hazards, and a method to circulate the information as necessary.

    CAMO.A.202(c)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Provide any subcontracted organisation with access to the internal safety reporting scheme.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.202(d)

    (d)The organisation shall provide access to its internal safety reporting scheme to any subcontracted organisation.

    CAMO.A.202(d) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Cooperate on safety investigations with any other organisation significantly contributing to the safety of the organisation’s continuing airworthiness management activities.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.202(e)

    (e)The organisation shall cooperate on safety investigations with any other organisation having a significant contribution to the safety of its own continuing airworthiness management activities.

    CAMO.A.202(e) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.205Contracting and subcontracting

4 obligations · Rule text

  • Must

    Ensure these activities conform to the applicable requirements.

    When contracting maintenance or subcontracting continuing airworthiness management activities.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.205(a)(1)

    (a)The organisation shall ensure that when contracting maintenance or when subcontracting any part of its continuing airworthiness management activities: (1) these activities conform to the applicable requirements; and

    CAMO.A.205(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure associated aviation safety hazards are considered as part of the organisation’s management system.

    When contracting maintenance or subcontracting continuing airworthiness management activities.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.205(a)(2)

    (a)The organisation shall ensure that when contracting maintenance or when subcontracting any part of its continuing airworthiness management activities: (1) these activities conform to the applicable requirements; and (2) any aviation safety hazards associated with such contracting or subcontracting are considered as part of the organisation’s management system.

    CAMO.A.205(a)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Keep subcontracted continuing airworthiness management activities under the organisation’s approval.

    When subcontracting any continuing airworthiness management activities to another organisation.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.205(b)

    (b)When the organisation subcontracts any part of its continuing airworthiness management activities to another organisation, the subcontracted organisation shall work under the approval of the organisation.

    CAMO.A.205(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure the competent authority is given access to the subcontracted organisation to determine continued compliance with applicable requirements.

    When subcontracting any continuing airworthiness management activities to another organisation.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.205(b)

    (b)When the organisation subcontracts any part of its continuing airworthiness management activities to another organisation, the subcontracted organisation shall work under the approval of the organisation. The organisation shall ensure that the competent authority is given access to the subcontracted organisation, to determine continued compliance with the applicable requirements.

    CAMO.A.205(b) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.215Facilities

1 obligation · Rule text

  • Must

    Provide suitable office accommodation at appropriate locations for the personnel specified in CAMO.A.305.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.215

    The organisation shall provide suitable office accommodation at appropriate locations for the personnel specified in point CAMO.A.305.

    CAMO.A.215 · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.220Record-keeping

15 obligations · Rule text

  • Must

    Ensure retention of the records required by M.A.305, ML.A.305 and, if applicable, M.A.306.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.220(a)(1)

    (1)The organisation shall ensure that records required by points M.A.305, ML.A.305 and, if applicable point M.A.306, are retained.

    CAMO.A.220(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Record all details of the work carried out.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.220(a)(2)

    (2)The organisation shall record all details of work carried out.

    CAMO.A.220(a)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain a copy of each airworthiness review certificate and recommendation issued, as applicable, together with the airworthiness review report.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.220(a)(3)

    (3)The organisation shall retain a copy of each airworthiness review certificate and recommendation that are issued, as applicable, together with the airworthiness review report.

    CAMO.A.220(a)(3) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain a copy of each evaluation programme and evaluation report issued in accordance with 21.A.174(d) or 21L.A.143(h), as applicable.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.220(a)(4)

    (4)The organisation shall retain a copy of each evaluation programme and evaluation report that are issued in accordance with the provisions of point 21.A.174(d) of Annex I (Part 21) or, as applicable, point 21L.A.143(h) of Annex Ib (Part 21 Light) to Regulation (EU) No 748/2012.

    CAMO.A.220(a)(4) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain a copy of each permit to fly and its related documents in accordance with 21.A.5(c)(2) or 21L.A.7(c), as applicable.

    Who
    CAMO
    When
    On an event
    Time limit
    for 5 years from the permit’s issue date
    Rule text CAMO.A.220(a)(5)

    (5)The organisation shall retain a copy of each permit to fly that is issued, and the related documents, in accordance with the provisions of point 21.A.5(c)(2) of Annex I (Part 21) or, as applicable, point 21L.A.7(c) of Annex Ib (Part 21 Light) to Regulation (EU) No 748/2012 for a period of 5 years from the date on which the permit to fly was issued.

    CAMO.A.220(a)(5) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain copies of all records referred to in CAMO.A.220(a)(2), CAMO.A.220(a)(3) and CAMO.A.220(a)(4).

    After continuing airworthiness management under M.A.201 or ML.A.201, as applicable, is transferred to another person or organisation.

    Who
    CAMO
    When
    On an event
    Time limit
    for 3 years after the transfer
    Rule text CAMO.A.220(a)(6)

    (6)The organisation shall retain a copy of all records referred to in points (2), (3) and (4) of this point for a period of 3 years after the continuing airworthiness management of the aircraft in accordance with point M.A.201 of Annex I (Part-M) or point ML.A.201 of Annex Vb (Part-ML), as applicable, has been transferred to another person or organisation.

    CAMO.A.220(a)(6) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain copies of the records referred to in CAMO.A.220(a)(3), CAMO.A.220(a)(4) and CAMO.A.220(a)(5), with all supporting documents.

    If issuing an airworthiness review certificate, recommendation, evaluation programme/report or permit to fly while another organisation manages the aircraft’s continuing airworthiness.

    Who
    CAMO
    When
    On an event
    Time limit
    for 5 years from the document’s issue date
    Rule text CAMO.A.220(a)(7)

    (7)If the organisation issuing the airworthiness review certificate, recommendation, evaluation programme/report or permit to fly is different from the organisation managing the continuing airworthiness of the aircraft, the issuing organisation shall retain a copy of all records referred to in points (3), (4) and (5) and all supporting documents for a period of 5 years from the date on which the airworthiness review certificate, recommendation, evaluation programme/report or permit to fly was issued.

    CAMO.A.220(a)(7) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Transfer all retained records to the aircraft owner.

    When the organisation ceases operations.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.220(a)(8)

    (8)When the organisation ceases operations, all retained records shall be transferred to the owner of the aircraft.

    CAMO.A.220(a)(8) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain records of management system key processes under CAMO.A.200 and contracts for contracting and subcontracting under CAMO.A.205.

    Who
    CAMO
    When
    Always
    Time limit
    for a minimum of 5 years
    Rule text CAMO.A.220(b)(1)

    (b)Management system, contracting and subcontracting records (1) The organisation shall ensure that the following records are retained: (i) records of management system key processes as defined in point CAMO.A.200; (ii) contracts, both for contracting and subcontracting, as defined in point CAMO.A.205; (2) Management system records, as well as any contracts pursuant to point CAMO.A.205, shall be kept for a minimum period of 5 years.

    CAMO.A.220(b)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain qualification and experience records for personnel involved in continuing airworthiness management, compliance monitoring and safety management, and all airworthiness review staff and staff issuing recommendations and permits to fly.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.220(c)(1)

    (c)Personnel records (1) The organisation shall ensure that the following records are retained: (i) records of qualification and experience of personnel involved in continuing airworthiness management, compliance monitoring and safety management; (ii) records of qualification and experience of all airworthiness review staff, as well as staff issuing recommendations and permits to fly.

    CAMO.A.220(c)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Include appropriate qualifications, a summary of relevant continuing airworthiness management experience and training, and a copy of the authorisation in personnel records.

    For airworthiness review staff, staff issuing recommendations and staff issuing permits to fly.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.220(c)(2)

    (2)The records of all airworthiness review staff, staff issuing recommendations and staff issuing permits to fly shall include details of any appropriate qualification held together with a summary of the relevant continuing airworthiness management experience and training and a copy of the authorisation.

    CAMO.A.220(c)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Retain the organisation’s records for each member of personnel.

    Who
    CAMO
    When
    Always
    Time limit
    throughout employment and until 3 years after leaving
    Rule text CAMO.A.220(c)(3)

    (3)Personnel records shall be kept as long as the person works for the organisation, and shall be retained until 3 years after the person has left the organisation.

    CAMO.A.220(c)(3) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Establish a record-keeping system providing adequate storage and reliable traceability of all activities.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.220(d)

    (d)The organisation shall establish a system of record-keeping that allows adequate storage and reliable traceability of all activities developed.

    CAMO.A.220(d) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Specify the format of records in the organisation’s procedures.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.220(e)

    (e)The format of the records shall be specified in the organisation's procedures.

    CAMO.A.220(e) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Store records with protection from damage, alteration and theft.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.220(f)

    (f)Records shall be stored in a manner that ensures protection from damage, alteration and theft.

    CAMO.A.220(f) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.300Continuing airworthiness management exposition (CAME)

7 obligations · Rule text

  • Must

    Provide the competent authority with a CAME containing every item in CAMO.A.300(a)(1) to (a)(14), together with referenced associated manuals and procedures where applicable.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.300(a)

    (a)The organisation shall provide the competent authority with a CAME and, where applicable, any referenced associated manuals and procedures, containing all of the following information:

    CAMO.A.300(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Sign the CAME statement confirming that the organisation will always work in accordance with Part-CAMO, Part-M and Part-ML, as applicable, and the approved CAME.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    On an event
    Rule text CAMO.A.300(a)(1)

    (1)a statement signed by the accountable manager confirming that the organisation will at all times work in accordance with this Annex, Annex I (Part-M) and Annex Vb (Part-ML), as applicable, and with the approved CAME. When the accountable manager is not the chief executive officer of the organisation, then such chief executive officer shall countersign the statement;

    CAMO.A.300(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Countersign the statement signed by the accountable manager.

    When the accountable manager is not the organisation’s chief executive officer, for that chief executive officer.

    Who
    Accountable manager and nominated persons
    When
    On an event
    Rule text CAMO.A.300(a)(1)

    (1)a statement signed by the accountable manager confirming that the organisation will at all times work in accordance with this Annex, Annex I (Part-M) and Annex Vb (Part-ML), as applicable, and with the approved CAME. When the accountable manager is not the chief executive officer of the organisation, then such chief executive officer shall countersign the statement;

    CAMO.A.300(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Obtain competent authority approval for the CAME.

    For the initial issue of the CAME.

    Who
    CAMO
    When
    Once
    Rule text CAMO.A.300(b)

    The initial issue of the CAME shall be approved by the competent authority.

    CAMO.A.300(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Amend the CAME as necessary to keep it an up-to-date description of the organisation.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.300(b)

    It shall be amended as necessary to remain an up-to-date description of the organisation.

    CAMO.A.300(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Manage CAME amendments as defined in the procedures referred to in CAMO.A.300(a)(11)(iv) and CAMO.A.300(a)(11)(v).

    When amending the CAME.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.300(c)

    Amendments to the CAME shall be managed as defined in the procedures referred to in points (a)(11)(iv) and (a)(11)(v).

    CAMO.A.300(c) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Obtain competent authority approval for CAME amendments.

    For amendments outside the scope of the CAMO.A.300(a)(11)(iv) procedure, or related to changes listed in CAMO.A.130(a).

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.300(c)

    Any amendments not included in the scope of the procedure referred to in point (a)(11)(iv), as well as amendments related to the changes listed in point CAMO.A.130(a), shall be approved by the competent authority.

    CAMO.A.300(c) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.305Personnel requirements

19 obligations · Rule text

  • Must

    Appoint an accountable manager with corporate authority to ensure all continuing airworthiness management activities can be financed and carried out in accordance with Regulation (EU) 2018/1139 and its delegated and implementing acts.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.305(a)

    (a)The organisation shall appoint an accountable manager, who has corporate authority for ensuring that all continuing airworthiness management activities can be financed and carried out in accordance with Regulation (EU) 2018/1139 and delegated and implementing acts adopted on the basis thereof.

    CAMO.A.305(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure all necessary resources are available to manage continuing airworthiness in accordance with Part-CAMO, Part-M and Part-ML, as applicable, to support the organisation approval certificate.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(a)(1)

    The accountable manager shall: (1) ensure that all necessary resources are available to manage continuing airworthiness in accordance with this Annex, Annex I (Part-M) and Annex Vb (Part-ML), as applicable, to support the organisation approval certificate;

    CAMO.A.305(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Establish and promote the safety policy specified in CAMO.A.200.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(a)(2)

    (2)establish and promote the safety policy specified in point CAMO.A.200;

    CAMO.A.305(a)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Nominate a person or group responsible for ensuring continual compliance with applicable continuing airworthiness management, airworthiness review and permit to fly requirements of Part-CAMO, Part-M and Part-ML.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(a)(3)

    (3)nominate a person or group of persons with the responsibility of ensuring that the organisation always complies with the applicable continuing airworthiness management, airworthiness review and permit to fly requirements of this Annex, Annex I (Part-M) and Annex Vb (Part-ML);

    CAMO.A.305(a)(3) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Nominate a person or group responsible for managing the compliance monitoring function within the management system.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(a)(4)

    (4)nominate a person or group of persons with the responsibility for managing the compliance monitoring function as part of the management system;

    CAMO.A.305(a)(4) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Nominate a person or group responsible for managing the development, administration and maintenance of effective safety management processes within the management system.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(a)(5)

    (5)nominate a person or group of persons with the responsibility for managing the development, administration, and maintenance of effective safety management processes as part of the management system;

    CAMO.A.305(a)(5) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure persons nominated under CAMO.A.305(a)(3) to (a)(5) and (b)(2) have direct access to keep the accountable manager properly informed on compliance and safety matters.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(a)(6)

    (6)ensure that the person or group of persons nominated in accordance with points (a)(3) to (a)(5) and (b)(2) of point CAMO.A.305 have direct access to keep him/her properly informed on compliance and safety matters;

    CAMO.A.305(a)(6) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Demonstrate a basic understanding of this Regulation.

    For the accountable manager.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(a)(7)

    (7)demonstrate a basic understanding of this Regulation.

    CAMO.A.305(a)(7) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Be the person appointed as the air carrier’s accountable manager under ORO.GEN.210(a).

    For the accountable manager of an organisation also approved as an air carrier licensed under Regulation (EC) No 1008/2008.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(b)(1)

    (b)For organisations also approved as air carriers licensed in accordance with Regulation (EC) No 1008/2008, the accountable manager shall in addition: (1) be the person appointed as accountable manager for the air carrier as required by point (a) of point ORO.GEN.210 of Annex III (Part-ORO) to Regulation (EU) No 965/2012;

    CAMO.A.305(b)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Nominate a person responsible for managing and supervising continuing airworthiness.

    For the accountable manager of an organisation also approved as an air carrier licensed under Regulation (EC) No 1008/2008.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(b)(2)

    (b)For organisations also approved as air carriers licensed in accordance with Regulation (EC) No 1008/2008, the accountable manager shall in addition: (1) be the person appointed as accountable manager for the air carrier as required by point (a) of point ORO.GEN.210 of Annex III (Part-ORO) to Regulation (EU) No 965/2012; (2) nominate a person responsible for the management and supervision of continuing airworthiness, who shall not be employed by an organisation approved in accordance with Annex II (Part-145) under contract to the operator, unless specifically agreed by the competent authority.

    CAMO.A.305(b)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must not

    Be employed by a Part-145 organisation under contract to the operator.

    For the person nominated under CAMO.A.305(b)(2), unless specifically agreed by the competent authority.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(b)(2)

    (b)For organisations also approved as air carriers licensed in accordance with Regulation (EC) No 1008/2008, the accountable manager shall in addition: (1) be the person appointed as accountable manager for the air carrier as required by point (a) of point ORO.GEN.210 of Annex III (Part-ORO) to Regulation (EU) No 965/2012; (2) nominate a person responsible for the management and supervision of continuing airworthiness, who shall not be employed by an organisation approved in accordance with Annex II (Part-145) under contract to the operator, unless specifically agreed by the competent authority.

    CAMO.A.305(b)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must not

    Be employed by a Part-145 organisation under contract to the CAMO.

    For CAMO.A.305(a)(3) nominees involved in continuing airworthiness management under an M.A.201(ea) contract, unless specifically agreed by the competent authority.

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(ba)

    (ba)If involved in continuing airworthiness management activities related to a contract established in accordance with point M.A.201(ea), the person or persons nominated in accordance with point (a)(3) of point CAMO.A.305 shall not be employed by an organisation approved in accordance with Annex II (Part-145) under contract to the CAMO, unless specifically agreed by the competent authority.

    CAMO.A.305(ba) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Demonstrate relevant knowledge, background and satisfactory experience in aircraft continuing airworthiness management, and a working knowledge of this Regulation.

    For persons nominated under CAMO.A.305(a)(3) to (a)(5) and (b)(2).

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(c)

    (c)The person or persons nominated in accordance with points (a)(3) to (a)(5) and (b)(2) of point CAMO.A.305 shall be able to demonstrate relevant knowledge, background and satisfactory experience related to aircraft continuing airworthiness management and demonstrate a working knowledge of this Regulation.

    CAMO.A.305(c) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Be ultimately responsible to the accountable manager.

    For persons nominated under CAMO.A.305(a)(3) to (a)(5) and (b)(2).

    Who
    Accountable manager and nominated persons
    When
    Always
    Rule text CAMO.A.305(c)

    (c)The person or persons nominated in accordance with points (a)(3) to (a)(5) and (b)(2) of point CAMO.A.305 shall be able to demonstrate relevant knowledge, background and satisfactory experience related to aircraft continuing airworthiness management and demonstrate a working knowledge of this Regulation. Such person(s) shall be ultimately responsible to the accountable manager.

    CAMO.A.305(c) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Maintain a system to plan staff availability, ensuring sufficient appropriately qualified staff to plan, perform, supervise, inspect and monitor the organisation’s activities in accordance with the terms of approval.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.305(d)

    (d)The organisation shall have a system in place to plan the availability of staff to ensure that the organisation has sufficient appropriately qualified staff to plan, perform, supervise, inspect and monitor the organisation’s activities in accordance with the terms of approval.

    CAMO.A.305(d) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Have airworthiness review staff qualified and authorised in accordance with CAMO.A.310.

    For approval to carry out airworthiness reviews or recommendations under CAMO.A.125(e) and, if applicable, issue permits to fly under CAMO.A.125(f).

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.305(e)

    (e)To be approved to carry out airworthiness reviews or recommendations in accordance with point (e) of point CAMO.A.125 and, if applicable, to issue permits to fly in accordance with point (f) of point CAMO.A.125, the organisation shall have airworthiness review staff qualified and authorised in accordance with point CAMO.A.310.

    CAMO.A.305(e) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Nominate persons authorised to extend airworthiness review certificates.

    For organisations extending airworthiness review certificates under CAMO.A.125(d)(4).

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.305(f)

    (f)For organisations extending airworthiness review certificates in accordance with point (d)(4) of point CAMO.A.125, the organisation shall nominate persons authorised to do so.

    CAMO.A.305(f) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Establish and control personnel competency in compliance monitoring, safety management, continuing airworthiness management, airworthiness reviews or recommendations and, if applicable, issuing permits to fly, in accordance with a procedure and to a standard agreed by the competent authority.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.305(g)

    The organisation shall establish and control the competency of personnel involved in compliance monitoring, safety management, continuing airworthiness management, airworthiness reviews or recommendations, and, if applicable, issuing permits to fly, in accordance with a procedure and to a standard agreed by the competent authority.

    CAMO.A.305(g) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure personnel competency includes job expertise and understanding of safety management and human factors principles appropriate to each person’s function and responsibilities.

    For personnel involved in the activities listed in CAMO.A.305(g).

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.305(g)

    In addition to the necessary expertise related to the job function, competency must include an understanding of safety management and human factors principles appropriate to the person’s function and responsibilities in the organisation.

    CAMO.A.305(g) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.310Airworthiness review staff qualifications

7 obligations · Rule text

  • Must

    Have airworthiness review staff with at least 5 years of experience in continuing airworthiness.

    For approval to carry out airworthiness reviews and, if applicable, issue permits to fly.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.310(a)(1)

    (a)In order to be approved to carry out airworthiness reviews and, if applicable, to issue permits to fly, the organisation shall have airworthiness review staff that comply with all the following requirements: (1) they have acquired at least 5 years of experience in continuing airworthiness; (2) they hold an appropriate licence in compliance with Annex III (Part-66), or an aeronautical degree or national equivalent; (3) they have received formal aeronautical maintenance training; (4) they have a position within the approved organisation with appropriate responsibilities. (b) Notwithstanding points (a)(1), (a)(3) and (a)(4), the requirement laid down in point (a)(2) may be replaced with 5 years of experience in continuing airworthiness additional to those already required by point (a)(1).

    CAMO.A.310(a)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Have airworthiness review staff holding an appropriate Part-66 licence, aeronautical degree or national equivalent.

    For approval to carry out airworthiness reviews and, if applicable, issue permits to fly, unless using the alternative in CAMO.A.310(b).

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.310(a)(2)

    (a)In order to be approved to carry out airworthiness reviews and, if applicable, to issue permits to fly, the organisation shall have airworthiness review staff that comply with all the following requirements: (1) they have acquired at least 5 years of experience in continuing airworthiness; (2) they hold an appropriate licence in compliance with Annex III (Part-66), or an aeronautical degree or national equivalent; (3) they have received formal aeronautical maintenance training; (4) they have a position within the approved organisation with appropriate responsibilities. (b) Notwithstanding points (a)(1), (a)(3) and (a)(4), the requirement laid down in point (a)(2) may be replaced with 5 years of experience in continuing airworthiness additional to those already required by point (a)(1).

    CAMO.A.310(a)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Have airworthiness review staff who have received formal aeronautical maintenance training.

    For approval to carry out airworthiness reviews and, if applicable, issue permits to fly.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.310(a)(3)

    (a)In order to be approved to carry out airworthiness reviews and, if applicable, to issue permits to fly, the organisation shall have airworthiness review staff that comply with all the following requirements: (1) they have acquired at least 5 years of experience in continuing airworthiness; (2) they hold an appropriate licence in compliance with Annex III (Part-66), or an aeronautical degree or national equivalent; (3) they have received formal aeronautical maintenance training; (4) they have a position within the approved organisation with appropriate responsibilities. (b) Notwithstanding points (a)(1), (a)(3) and (a)(4), the requirement laid down in point (a)(2) may be replaced with 5 years of experience in continuing airworthiness additional to those already required by point (a)(1).

    CAMO.A.310(a)(3) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Have airworthiness review staff holding a position within the approved organisation with appropriate responsibilities.

    For approval to carry out airworthiness reviews and, if applicable, issue permits to fly.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.310(a)(4)

    (a)In order to be approved to carry out airworthiness reviews and, if applicable, to issue permits to fly, the organisation shall have airworthiness review staff that comply with all the following requirements: (1) they have acquired at least 5 years of experience in continuing airworthiness; (2) they hold an appropriate licence in compliance with Annex III (Part-66), or an aeronautical degree or national equivalent; (3) they have received formal aeronautical maintenance training; (4) they have a position within the approved organisation with appropriate responsibilities. (b) Notwithstanding points (a)(1), (a)(3) and (a)(4), the requirement laid down in point (a)(2) may be replaced with 5 years of experience in continuing airworthiness additional to those already required by point (a)(1).

    CAMO.A.310(a)(4) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Replace the qualification requirement in CAMO.A.310(a)(2) with 5 additional years of continuing airworthiness experience beyond those required by CAMO.A.310(a)(1).

    If CAMO.A.310(a)(1), CAMO.A.310(a)(3) and CAMO.A.310(a)(4) remain satisfied.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.310(b)

    (b)Notwithstanding points (a)(1), (a)(3) and (a)(4), the requirement laid down in point (a)(2) may be replaced with 5 years of experience in continuing airworthiness additional to those already required by point (a)(1).

    CAMO.A.310(b) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Perform an airworthiness review under competent authority supervision or supervision by the organisation’s already authorised airworthiness review staff, following a procedure approved by the competent authority.

    Before the organisation issues an airworthiness review authorisation to the candidate.

    Who
    Airworthiness review staff
    When
    On an event
    Rule text CAMO.A.310(c)

    Before the organisation issues an airworthiness review authorisation to a candidate, that person shall perform an airworthiness review under the supervision of the competent authority or under the supervision of a person that is already authorised as airworthiness review staff by the organisation, in accordance with a procedure approved by the competent authority.

    CAMO.A.310(c) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure airworthiness review staff can demonstrate appropriate recent continuing airworthiness management experience.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.310(d)

    (d)The organisation shall ensure that airworthiness review staff can demonstrate appropriate recent continuing airworthiness management experience.

    CAMO.A.310(d) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.315Continuing airworthiness management

10 obligations · Rule text

  • Must

    Ensure all continuing airworthiness management follows Section A, Subpart C of Part-M or Part-ML, as applicable.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.315(a)

    (a)The organisation shall ensure that all continuing airworthiness management is carried out in accordance with Section A, Subpart C of Annex I (Part-M), or Section A Subpart C of Annex Vb (Part-ML), as applicable.

    CAMO.A.315(a) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure an aircraft maintenance programme, including any applicable reliability programme required by M.A.302 or ML.A.302, as applicable, is developed and controlled.

    For every aircraft managed.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.315(b)(1)

    (b)For every aircraft managed, the organisation shall in particular: (1) ensure that an aircraft maintenance programme including any applicable reliability programme, as required by point M.A.302 or ML.A.302 as applicable, is developed and controlled;

    CAMO.A.315(b)(1) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Provide a copy of the aircraft maintenance programme to the owner or operator responsible under M.A.201 or ML.A.201, as applicable.

    For managed aircraft not used by air carriers licensed in accordance with Regulation (EC) No 1008/2008.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.315(b)(2)

    (2)for aircraft not used by air carriers licensed in accordance with Regulation (EC) No 1008/2008, provide a copy of the aircraft maintenance programme to the owner or operator responsible in accordance with point M.A.201 or ML.A.201 as applicable;

    CAMO.A.315(b)(2) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure data used for modifications and repairs complies with M.A.304 or ML.A.304, as applicable.

    For every aircraft managed.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.315(b)(3)

    (3)ensure that data used for any modification and repairs complies with points M.A.304 or ML.A.304 as applicable;

    CAMO.A.315(b)(3) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Establish a procedure to assess non-mandatory modifications and/or inspections and decide on their application using the organisation’s safety risk management process under CAMO.A.200(a)(3).

    For managed complex motor-powered aircraft, or managed aircraft used by air carriers licensed under Regulation (EC) No 1008/2008.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.315(b)(4)

    (4)for all complex motor-powered aircraft or aircraft used by air carriers licensed in accordance with Regulation (EC) No 1008/2008, establish a procedure to assess non-mandatory modifications and/or inspections and decide on their application, making use of the organisation’s safety risk management process as required by point (a)(3) of point CAMO.A.200;

    CAMO.A.315(b)(4) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure aircraft, engines, propellers and their components are taken to appropriately approved maintenance organisations referred to in Part-M Subpart F, Part-145 or Part-CAO.

    For every managed aircraft, whenever necessary.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.315(b)(5)

    (5)ensure that the aircraft, engine(s), propeller(s) and components thereof are taken to an appropriately approved maintenance organisation referred to in Subpart F of Annex I (Part-M), Annex II (Part-145) or Annex Vd (Part-CAO) whenever necessary;

    CAMO.A.315(b)(5) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Order maintenance, supervise activities and coordinate related decisions to ensure maintenance is properly carried out and appropriately released for the determination of aircraft airworthiness.

    For every aircraft managed.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.315(b)(6)

    (6)order maintenance, supervise activities, and coordinate related decisions to ensure that any maintenance is carried out properly and is appropriately released for the determination of aircraft airworthiness.

    CAMO.A.315(b)(6) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Manage the M.A.201(e)(3), (f)(3), (g)(3), (h)(3) or ML.A.201 written maintenance contracts in consultation with the operator, ensuring all maintenance is ultimately performed by appropriately approved maintenance organisations and clearly specifying the functions in CAMO.A.315(c)(2).

    When lacking appropriate Part-M Subpart F, Part-145 or Part-CAO approval, subject to CAMO.A.315(d).

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.315(c)

    (c)Where the organisation is not appropriately approved in accordance with Subpart F of Annex I (Part-M), Annex II (Part-145) or Annex Vd (Part-CAO) it shall, in consultation with the operator, manage the written maintenance contracts required by points (e)(3), (f)(3), (g)(3) and (h)(3) of M.A.201 or point ML.A.201 to ensure that: (1) all maintenance is ultimately carried out by an appropriately approved maintenance organisation; (2) the functions required under points (b), (c), (f) and (g) of point M.A.301 of Annex I (Part-M) or point ML.A.301 of Annex Vb (Part-ML), as applicable, are clearly specified.

    CAMO.A.315(c) · Regulation (EU) No 1321/2014 · verbatim

  • May

    Use individual work orders addressed to the maintenance organisation as the contract referred to in CAMO.A.315(c).

    For an aircraft requiring unscheduled line maintenance, or for component maintenance, including engine and propeller maintenance, as applicable.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.315(d)

    (d)Notwithstanding point (c), the contract may be in the form of individual work orders addressed to the maintenance organisation in the case of: (1) an aircraft requiring unscheduled line maintenance; (2) component maintenance, including engine and propeller maintenance, as applicable.

    CAMO.A.315(d) · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Ensure human factors and human performance limitations are taken into account during continuing airworthiness management, including all contracted and subcontracted activities.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.315(e)

    (e)The organisation shall ensure that human factors and human performance limitations are taken into account during continuing airworthiness management, including all contracted and subcontracted activities.

    CAMO.A.315(e) · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.320Airworthiness review

1 obligation · Rule text

  • Must

    Carry out airworthiness reviews in accordance with M.A.903 or ML.A.903, as applicable.

    When an organisation approved under CAMO.A.125(e) carries out airworthiness reviews.

    Who
    CAMO
    When
    On an event
    Rule text CAMO.A.320

    When the organisation approved in accordance with point CAMO.A.125(e) of this Annex carries out airworthiness reviews, they shall be carried out in accordance with point M.A.903 of Annex I (Part-M) or point ML.A.903 of Annex Vb (Part-ML), as applicable.

    CAMO.A.320 · Regulation (EU) No 1321/2014 · verbatim

CAMO.A.325Continuing airworthiness management data

3 obligations · Rule text

  • Must

    Hold and use applicable current maintenance data in accordance with M.A.401 or ML.A.401, as applicable.

    For the continuing airworthiness tasks referred to in CAMO.A.315.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.325

    The organisation shall hold and use applicable current maintenance data in accordance with point M.A.401 of Annex I (Part-M) or point ML.A.401 of Annex Vb (Part-ML), as applicable, for the performance of continuing airworthiness tasks referred to in point CAMO.A.315 of this Annex (Part-CAMO).

    CAMO.A.325 · Regulation (EU) No 1321/2014 · verbatim

  • May

    Use maintenance data provided by the aircraft’s owner or operator.

    If an appropriate contract is established with that owner or operator.

    Who
    CAMO
    When
    Always
    Rule text CAMO.A.325

    That data may be provided by the owner or the operator, subject to an appropriate contract being established with such an owner or operator.

    CAMO.A.325 · Regulation (EU) No 1321/2014 · verbatim

  • Must

    Keep maintenance data supplied by the owner or operator.

    If supplied under an appropriate contract, unless CAMO.A.220(a) requires otherwise.

    Who
    CAMO
    When
    Always
    Time limit
    only for the duration of the contract
    Rule text CAMO.A.325

    That data may be provided by the owner or the operator, subject to an appropriate contract being established with such an owner or operator. In such case, the continuing airworthiness management organisation shall only keep such data for the duration of the contract, except when otherwise required by point CAMO.A.220(a).

    CAMO.A.325 · Regulation (EU) No 1321/2014 · verbatim

3 rules and appendices set no obligation
  • CAMO.A.005

    Scope — Scope statement describing qualification for certification; no separate duty, permission or prohibition.

  • CAMO.A.105

    Competent authority — Designates the competent authority; no action is assigned to an organisation or individual within the actor vocabulary.

  • Appendix I

    Continuing Airworthiness Management Organisation Certificate – EASA Form 14 — Certificate and terms-of-approval template; excluded as instructed.

  • Written from the implementing rules of Regulation (EU) No 1321/2014 — Section A and the appendices that set requirements — as amended up to Implementing Regulation (EU) 2026/100.
  • Every quoted sentence was checked word for word against that text on 2 Nov 2026.
  • AMC and GM are not included: they show ways to comply; this list is what the rule itself requires. Section B, what the competent authority does, is not included.
  • A summary can lose a nuance. The rule text binds, together with your approved exposition and your competent authority. Not the official publication — verify against the Official Journal of the European Union before operational use.
Ask Metis which Part-CAMO obligations apply to you →

Metis opens with Avioverse · request early access.